Data Centers in Piauí
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Brazil
- São Paulo 69
- Rio de Janeiro 37
- Campinas 16
- Porto Alegre 14
- Fortaleza 11
- Salvador 9
- Curitiba 7
- Belo Horizonte 5
- Brasilia 5
- Joao Pessoa 5
- Maringá 4
- Recife 4
- São José do Rio Preto 4
- Aracaju 3
- Campina Grande 3
- Campo Grande 3
- Cascavel 2
- Goiânia 2
- Londrina 2
- São Luís 2
- Belém 1
- Boa Vista 1
- Brusque 1
- Cacoal 1
- Chapecó 1
- Cuiabá 1
- Eunápolis 1
- Florianópolis 1
- Foz do Iguaçu 1
- Joinville 1
- Linhares 1
- Maceió 1
- Muriaé 1
- Natal 1
- Palmas 1
- Praia Grande 1
- Ribeirão Preto 1
- Rio Claro 1
- Rio Grande do Sul Interior 1
- Santa Maria 1
- Santa Rosa 1
- Santos 1
- Sete Lagoas 1
- Teresina 1
- Torres 1
- Tucuruí 1
- Vale do Aço 1
- Videira 1
- Vitória 1
Piauí – Strategic Connectivity Hub for the Mid-North
Executive Summary
Piauí serves as a vital strategic link for businesses targeting growth in the Northern and Northeastern regions of Brazil. This market provides essential regional edge capacity and disaster recovery sites for organizations requiring proximity to local users and specific tax advantages. Deploying here ensures lower latency for the regional population while maintaining a direct connection to major Brazilian digital hubs as of September 2025.
Piauí: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Solid regional performance with reliable links to national backbones. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramp hub is Fortaleza; private extension options are available. |
| Power Cost | $0.14 – $0.18/kWh – as of September 2025 | Pricing reflects a renewable-heavy energy mix within the national grid. |
| Disaster Risk | High (5.2/10) – as of September 2025 | Flood and drought risks are primary considerations for site selection. |
| Tax Incentives | Yes | DC-specific tax breaks for IT hardware and infrastructure as of September 2025. |
| Sales Tax | 18.00% VAT – as of September 2025 | Combined rate including ICMS, PIS-COFINS, and ISS components. |
Network & Connectivity Ecosystem
Piauí is an emerging secondary market that bridges the gap between the saturated coastal hubs and the developing interior as of September 2025.
Carrier Density & Carrier Neutrality: Carrier count: over 5. Regional and national providers offer competitive fiber routes to neighboring states. The presence of multiple carriers ensures redundant paths for mission-critical traffic as of September 2025.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. Since local on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure are absent, most enterprises utilize private network interconnects or wave services to reach the nearest cloud hubs in Fortaleza or São Paulo as of September 2025.
Internet Exchange Points (IXPs): The market benefits from IX.br presence in cities like Parnaíba and Teresina. This local peering keeps traffic within the region and significantly reduces latency for regional users as of September 2025.
Bare Metal: Services are available through providers such as Latitude.sh or Hivelocity. These options allow for high-performance compute without the overhead of physical hardware management as of September 2025.
Power Analysis
Piauí leverages the diversified energy grid of Brazil, which is highly focused on sustainability and regional generation.
Average Cost Of Power: Estimated at $0.14 – $0.18/kWh as of September 2025. This rate allows for predictable operational expenses. The energy mix is approximately 60% hydro and 22% other renewables like wind and solar, making it a green choice for energy-intensive workloads.
Power Grid Reliability: The local grid is well-engineered with multi-substation support. It draws from the massive wind farm developments in the Northeast to ensure a reliable supply for industrial users as of September 2025.
Market Access, Business & Tax Climate
The business environment in Piauí is geared for regional expansion and cost-effective digital service delivery as of September 2025.
Proximity To Key Business Districts: Data centers are located to serve the Parnaíba and Teresina business districts. These areas are central to the state's logistics and services economy, requiring low-latency access for local operations.
Regional Market Reach: This location effectively serves the state's population and provides a gateway for digital services for the broader Mid-North region of Brazil. It is a strategic alternative to the more congested markets in the south.
Tax Advantage For Data Centers: Operators benefit from specific tax exemptions on imported data center hardware and IT-related capital expenditures. These incentives significantly reduce the initial cost of infrastructure deployment for enterprise customers as of September 2025.
Natural Disaster Risk
The overall risk for Piauí is rated as High (5.2/10) as of September 2025. While the region is stable seismically, environmental factors related to water and climate are the primary operational considerations.
River Flood: 7.7 (High) – This represents the most significant natural threat to infrastructure in the region.
Epidemic: 6.4 (High) – Regional health factors contribute to the socio-economic risk profile.
Coastal Flood: 5.0 (Moderate) – A material risk for coastal facilities in the North, requiring specific site elevation.
Drought: 4.5 (Moderate) – Seasonal variations can impact cooling systems, though most modern sites use closed-loop cooling.
Earthquake: 0.5 (Low) – Seismic activity is negligible as of September 2025.