Inflect logo

Eunápolis – Strategic Edge Access for Southern Bahia

Executive Summary

Eunápolis is the prime choice for operators targeting the southern interior of Bahia. It bridges the gap between major coastal centers and the agricultural heartland, ensuring localized performance and reduced latency for high-stakes business operations. Deploying here provides a resilient foothold in a market defined by rapid digital adoption and industrial growth.

Eunápolis: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBReliable regional link for local traffic.
Direct Cloud On-Ramps0 – as of January 2026São Paulo is the primary hub.
Power Cost$0.14–$0.21/kWh, as of January 2026Competitive rates for the interior.
Disaster RiskHigh (5.2/10), as of January 2026Primary concern is regional river flooding.
Tax IncentivesYesSignificant exemptions for IT capital equipment.
Sales Tax18% VAT, as of January 2026Consolidated ICMS, PIS-COFINS, and ISS rates.

Network & Connectivity Ecosystem

Eunápolis functions as a key transit point for data moving through the interior of Bahia, providing necessary redundancy for the fiber backbone of the state.

Carrier Density & Carrier Neutrality: Carrier count: over 5, as of January 2026. The environment provides enough regional backhaul and local last-mile options to ensure resilient connectivity for edge workloads. While not a massive global hub, it offers sufficient diversity for regional requirements.

Direct Cloud On-Ramps: 0, as of January 2026. There are currently no native on-ramps for AWS, Google Cloud (GCP), Microsoft Azure, Alibaba Cloud, Oracle Cloud, or IBM Cloud. Connectivity to these services is typically managed via private waves or transport to major hubs in São Paulo.

Internet Exchange Points (IXPs): Local traffic typically peers through regional exchange points in Salvador or connects directly to the national IX.br infrastructure in larger metropolitan hubs to ensure efficient routing.

Bare Metal: High-performance hardware is available through regional specialists and global providers like Latitude.sh, supporting automated infrastructure deployments for those who need to scale quickly without physical maintenance.

Power Analysis

The energy profile in Eunápolis is defined by the heavy reliance of Brazil on renewable sources, offering a sustainable footprint for data operations.

Average Cost Of Power: Industrial electricity is estimated between $0.14–$0.21/kWh, as of January 2026. This pricing allows for predictable operational expenses compared to the more expensive coastal markets.

Power Grid Reliability: The local grid is supported by a high percentage of hydroelectric power and is generally well-engineered. Major facilities often utilize multi-substation support to ensure consistent uptime for critical workloads.

Market Access, Business & Tax Climate

Eunápolis is a central point for the agribusiness and service sectors in southern Bahia, making it a logical choice for localized hosting.

Proximity To Key Business Districts: Data centers here are situated to serve the commercial and industrial sectors of Eunápolis and Porto Seguro, where rapid digital adoption is increasing demand for local compute.

Regional Market Reach: A facility in this location effectively serves a population of several hundred thousand across southern Bahia, reducing the distance data travels to reach the end user.

Tax Advantage For Data Centers: Operators benefit from substantial tax breaks on capital equipment. These incentives include tariff exemptions for imported servers and networking gear, lowering the cost of building out digital infrastructure.

Natural Disaster Risk

The overall risk profile for Eunápolis is rated as High (5.2/10), as of January 2026. Specific environmental factors require careful site selection and mitigation strategies.

  • River Flood (7.7/10): The most significant natural threat, requiring elevated facility designs and flood defense systems.
  • Coastal Flood (5.0/10): This is considered a regional risk due to proximity to the coast, though inland facilities are less directly affected.
  • Drought (4.5/10): A moderate risk that can impact long-term water cooling strategies and regional hydroelectric availability.
  • Earthquake (0.5/10): Extremely low seismic activity, making it a stable choice regarding tectonic safety.

Other natural hazards are minor or not listed for this specific metropolitan area. All risk assessments are current as of January 2026.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion