Data Centers in Chapecó
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Brazil
- São Paulo 69
- Rio de Janeiro 37
- Campinas 16
- Porto Alegre 14
- Fortaleza 11
- Salvador 9
- Curitiba 7
- Belo Horizonte 5
- Brasilia 5
- Joao Pessoa 5
- Maringá 4
- Recife 4
- São José do Rio Preto 4
- Aracaju 3
- Campina Grande 3
- Campo Grande 3
- Cascavel 2
- Goiânia 2
- Londrina 2
- São Luís 2
- Belém 1
- Boa Vista 1
- Brusque 1
- Cacoal 1
- Cuiabá 1
- Eunápolis 1
- Florianópolis 1
- Foz do Iguaçu 1
- Joinville 1
- Linhares 1
- Maceió 1
- Muriaé 1
- Natal 1
- Palmas 1
- Piauí 1
- Praia Grande 1
- Ribeirão Preto 1
- Rio Claro 1
- Rio Grande do Sul Interior 1
- Santa Maria 1
- Santa Rosa 1
- Santos 1
- Sete Lagoas 1
- Teresina 1
- Torres 1
- Tucuruí 1
- Vale do Aço 1
- Videira 1
- Vitória 1
Chapecó – Strategic Edge Reliability for the Agribusiness Heartland
Executive Summary
Chapecó serves as a critical edge node for the industrial and agricultural engine of Southern Brazil. It provides the necessary localized latency and redundancy for food processing and manufacturing giants that cannot rely solely on distant coastal hubs. Choosing this market ensures operational continuity and high-speed processing for regional automation.
Chapecó: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance as of September 2025. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramp hub is São Paulo. |
| Power Cost | R$ 0.62–0.78/kWh | Conservative range for regional industrial rates as of September 2025. |
| Disaster Risk | High (5.2/10) | Primarily driven by river flood risks as of September 2025. |
| Tax Incentives | Yes | Specific breaks for IT capital expenditures as of September 2025. |
| Sales Tax | 18% VAT | Combined ICMS/PIS-COFINS/ISS rate as of September 2025. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 10. As of September 2025, the market features 10–15 carriers including national backhaul operators and regional fiber providers, allowing for diverse path routing.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure located in the city as of September 2025. Connectivity to these platforms is managed via private transport or PNI to the primary hubs in São Paulo.
Internet Exchange Points (IXPs): The local IX.br presence keeps regional traffic local, which significantly reduces latency for regional eyeball networks and enterprise services as of September 2025.
Bare Metal: Sturdy bare metal options are available through providers such as Latitude.sh or Hivelocity, offering reliable hardware for edge computing requirements as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity ranges from R$ 0.62–0.78/kWh as of September 2025. Brazil’s energy mix is highly sustainable, consisting of approximately 60% hydro and 22% other renewables, ensuring a low carbon footprint for high-density deployments.
Power Grid Reliability: The grid is supported by hydro-heavy infrastructure and is well-engineered for consistency. Redundancy is maintained through multi-substation support, ensuring steady uptime for the primary data center facility in the market as of September 2025.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data center assets are located near the Senador Nereu Ramos corridor. This location is essential for the food processing and agribusiness sectors that require high-speed local processing for industrial automation and logistics as of September 2025.
Regional Market Reach: A facility in Chapecó serves western Santa Catarina, northern Rio Grande do Sul, and southwest Paraná effectively. It is a logical choice for caching and edge services targeting these inland populations as of September 2025.
Tax Advantage For Data Centers: Local and federal governments offer specific tax breaks for IT-related capital expenditures. This includes a tariff exemption for imported data center equipment, which lowers the initial cost of deployment as of September 2025.
Natural Disaster Risk
The environmental risk profile for Chapecó is High (5.2/10) as of September 2025. While the city avoids many coastal hazards, specific inland threats require resilient facility engineering.
- River Flood: 7.7/10. High risk; facilities should use elevated flooring and drainage systems as of September 2025.
- Epidemic: 6.4/10. Moderate to High risk; impacts local workforce availability as of September 2025.
- Coastal Flood: 5.0/10. Regional risk only; while the city is inland, coastal disruptions can impact broader regional supply chains as of September 2025.
- Drought: 4.5/10. Moderate risk; can impact the hydro-dependent power grid during extreme seasons as of September 2025.
Other natural hazards, such as earthquakes or tropical cyclones, are minor or not listed for this geography as of September 2025.