Data Centers in Chapecó
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Brazil
- São Paulo 69
- Rio de Janeiro 37
- Campinas 16
- Porto Alegre 14
- Fortaleza 11
- Salvador 9
- Curitiba 7
- Belo Horizonte 5
- Brasilia 5
- Joao Pessoa 5
- Maringá 4
- Recife 4
- São José do Rio Preto 4
- Aracaju 3
- Campina Grande 3
- Campo Grande 3
- Cascavel 2
- Goiânia 2
- Londrina 2
- São Luís 2
- Belém 1
- Boa Vista 1
- Brusque 1
- Cacoal 1
- Cuiabá 1
- Eunápolis 1
- Florianópolis 1
- Foz do Iguaçu 1
- Joinville 1
- Linhares 1
- Maceió 1
- Muriaé 1
- Natal 1
- Palmas 1
- Piauí 1
- Praia Grande 1
- Ribeirão Preto 1
- Rio Claro 1
- Rio Grande do Sul Interior 1
- Santa Maria 1
- Santa Rosa 1
- Santos 1
- Sete Lagoas 1
- Teresina 1
- Torres 1
- Tucuruí 1
- Vale do Aço 1
- Videira 1
- Vitória 1
Chapecó – Edge Infrastructure for Brazil’s Agribusiness Hub
Executive Summary
Chapecó serves as the primary edge node for Southern Brazil’s massive food processing and manufacturing sectors. This market provides localized latency required for industrial automation and real-time logistics in the country’s agricultural heartland.
Chapecó: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable regional performance as of January 2026. |
| Direct Cloud On-Ramps | 0 – as of January 2026 | Nearest primary on-ramp hub is São Paulo. |
| Power Cost | R$ 0.62–0.78/kWh | Conservative industrial pricing as of January 2026. |
| Disaster Risk | High (5.2/10) | Driven by river flood risks as of January 2026. |
| Tax Incentives | Yes | IT capital expenditure breaks available as of January 2026. |
| Sales Tax | 18% VAT | Combined regional and federal rate as of January 2026. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 10. There are ~10–15 carriers operating in the region as of January 2026, including major national backhaul providers and regional fiber operators that allow for diverse routing paths.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. There are no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city as of January 2026. Connectivity is managed via private transport or PNI to the primary on-ramp hubs in São Paulo.
Internet Exchange Points (IXPs): The local IX.br presence ensures regional traffic remains local. This significantly reduces latency for regional eyeball networks and enterprise services as of January 2026.
Bare Metal: Sturdy bare metal options are available through providers such as Latitude.sh. These offer reliable hardware for edge computing requirements without the overhead of virtualization as of January 2026.
Power Analysis
Average Cost Of Power: Industrial electricity ranges from R$ 0.62–0.78/kWh as of January 2026. The energy mix is sustainable, consisting of approximately 60% hydro and 22% other renewables, ensuring a low carbon footprint for high-density deployments.
Power Grid Reliability: The grid is well-engineered with a heavy reliance on hydro infrastructure. Redundancy is maintained through multi-substation support, ensuring steady uptime for mission-critical industrial deployments as of January 2026.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are strategically located near the Senador Nereu Ramos corridor. This proximity is vital for the food processing giants that require high-speed local processing for supply chain management as of January 2026.
Regional Market Reach: Chapecó effectively serves western Santa Catarina, northern Rio Grande do Sul, and southwest Paraná. It is the logical choice for edge services targeting these productive inland populations as of January 2026.
Tax Advantage For Data Centers: Local and federal governments provide tax exemptions for IT capital expenditures, including tariff waivers for imported equipment. This significantly reduces the total cost of ownership for data center operators as of January 2026.
Natural Disaster Risk
The environmental risk profile for Chapecó is High (5.2/10) as of January 2026. Specific inland threats require resilient facility engineering to maintain high uptime.
- River Flood: 7.7/10. High risk; facilities require elevated flooring and specialized drainage systems as of January 2026.
- Epidemic: 6.4/10. Moderate to High risk; this can impact local workforce availability as of January 2026.
- Coastal Flood: 5.0/10. Regional risk only; inland facilities are protected from direct surge but remain wary of regional supply chain impacts as of January 2026.
- Drought: 4.5/10. Moderate risk; severe dry seasons can occasionally stress the hydro-dependent power grid as of January 2026.
Other natural hazards, such as earthquakes or tropical cyclones, are minor or not listed for this geography as of January 2026.