Data Centers in Chos Malal
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Other Markets in Argentina
Chos Malal – Strategic Edge Reliability for Northern Patagonia
Executive Summary
Chos Malal serves as a vital edge location for organizations requiring local data residency and low-latency access within Neuquén province. This placement supports the regional energy and government sectors, ensuring reliable compute far from the primary hub in Buenos Aires. This specific geography is essential for maintaining uptime in geographically isolated industrial operations.
Chos Malal: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Stable regional connectivity for Neuquén as of September 2025. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest on-ramp hub is Buenos Aires. |
| Power Cost | $0.07/kWh – as of September 2025 | Competitive industrial rates for the region. |
| Disaster Risk | Low (3.0/10) – as of September 2025 | Stable environment with manageable local hazards. |
| Tax Incentives | Varies | Supportive digital economy framework exists as of September 2025. |
| Sales Tax | 21% VAT – as of September 2025 | Standard national value-added tax rate. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5 as of September 2025. The provider mix is specific to the region, offering necessary redundancy through national incumbents and specialized regional fiber networks.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions as of September 2025. There are no direct physical on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure here. Traffic typically reaches these services through private extensions or leased lines to the primary gateway in Buenos Aires.
Internet Exchange Points (IXPs): Local traffic is managed through the nearest CABASE IXP nodes to ensure efficient regional peering and lower latency for provincial users as of September 2025.
Bare Metal: High-performance hardware is available through specialized providers like Latitude.sh for specific edge workloads as of September 2025.
Power Analysis
Average Cost Of Power: Industrial electricity is priced at $0.07/kWh as of September 2025. This rate is a cost-effective alternative compared to major metropolitan markets. The regional grid uses a mix of approximately 65% fossil fuels and 30% renewables, including significant hydro and wind contributions.
Power Grid Reliability: The grid is purpose-built to support the administrative and industrial demands of northern Patagonia. Professional facilities utilize redundant configurations to ensure consistent service for mission-critical hardware as of September 2025.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Facilities are centrally located to support the administrative functions of Chos Malal and surrounding energy districts. This proximity is vital for local government services and technical field operations.
Regional Market Reach: This location serves as the primary digital gateway for northern Neuquén. It provides a logical base for reaching populations and industrial sites that are geographically isolated from central infrastructure.
Tax Advantage For Data Centers: Argentina maintains a supportive regulatory framework for the digital economy that encourages infrastructure investment. This environment helps businesses manage capital expenses for regional hardware deployments as of September 2025.
Natural Disaster Risk
The overall risk for Chos Malal is classified as Low (3.0/10) as of September 2025. The area is relatively stable for infrastructure, with specific hazards managed through standard facility engineering.
- River Flood: 7.7 (High) – Requires standard elevation and drainage protocols as of September 2025.
- Drought: 5.6 (Moderate) – May influence regional resource management as of September 2025.
- Earthquake: 5.5 (Moderate) – Facilities utilize seismic-rated enclosures to ensure stability as of September 2025.
- Epidemic: 4.4 (Moderate) – Consistent with regional averages for health management as of September 2025.
Other hazards like Tropical Cyclones or Coastal Flooding are not material for this inland location. All figures are as of September 2025.