Data Centers in Pakistan
11 locations found
- GS
Getlinks (SMC-Private) Multan
4 Bosan Road Multan PAK, Multan
- UI
Usman Internet Service Provider Private Bhalwal
Liaqat Shaheed Road Bhalwal PAK, Bhalwal
- TI
THE INFINITY BROADBAND (PVT) Lahore
77 E1, Main Boulevard، Gulberg Road، Block E 1 Gulberg III Lahore PAK, Lahore
- KN
KK Networks Lahore
77 E1, Main Boulevard، Gulberg Road، Block E 1 Gulberg III Lahore PAK, Lahore
- M
Multinet Lahore
Shahrah Aiwan-e-Sanat-o-Tijarat Lahore PAK, Lahore
- M
Multinet Islamabad
6 Jinnah Avenue Islamabad PAK, Islamabad
- TP
The Professional Communications Pvt Islamabad
Mohammadi Plaza, Bluearea,، F 6/4 Blue Area Blue Area PAK, Blue Area
- M
Multinet Karachi 1
P#30, Sec.28 Karachi PAK, Karachi
- M
Multinet Karachi
1D-203 Main Korangi Industrial Road Karachi Division 74900 PAK, Karachi Division
- LB
Logon Broadband Karachi
Teen Talwar, Zone A Block 7 Clifton Karachi Division 75600 PAK, Karachi Division
- CW
CubeXS Weatherly (Pvt) Karachi
Shahrah-e-Firdousi Karachi Division PAK, Karachi Division
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Explore Markets in Pakistan
Pakistan – Strategic Connectivity for South Asia's Digital Growth
Executive Summary
Pakistan is a vital strategic location for enterprises targeting a massive, mobile-first consumer base in one of the fastest-growing digital economies in the region. Local infrastructure ensures low-latency delivery and data sovereignty while providing a critical gateway between Western Asia and the broader Indo-Pacific markets.
Pakistan: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Improving regional hub with growing submarine cable landings. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest hubs are Dubai or Mumbai via private waves. |
| Power Cost | $0.14/kWh – as of September 2025 | Based on industrial rates and regional energy averages. |
| Disaster Risk | High (6.4/10) – as of September 2025 | Primary exposures include seismic activity and river flooding. |
| Tax Incentives | Yes | Includes 100% foreign equity and specific IT exemptions. |
| Sales Tax | 18% GST – as of September 2025 | Services taxed at 15–16% depending on the province. |
Network & Connectivity Ecosystem
Digital infrastructure in the region is maturing to support high-density requirements. Data center operators focus on carrier neutrality to improve redundancy and service quality for enterprise clients.
Carrier Density & Carrier Neutrality: Carrier count: over 20, as of September 2025. Facilities in major hubs provide neutral access to national telcos and international backhaul providers, ensuring resilient traffic routing across the country.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. While local physical on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure are absent, enterprises use private network interconnects or dedicated waves to reach hub cities like Dubai.
Internet Exchange Points (IXPs): The Pakistan Internet Exchange and PKIX serve as the primary hubs for local peering. These points significantly reduce the cost of domestic traffic exchange and improve performance for local users.
Bare Metal: High-performance compute options are available through specialized local integrators and neutral global providers. Standardized hardware deployments are typically managed through providers like phoenixNAP.
Power Analysis
The energy landscape is transitioning for a more diverse generation mix to support industrial growth. Data center corridors are prioritized for stability to maintain uptime requirements.
Average Cost Of Power: Industrial electricity is approximately $0.14/kWh, as of September 2025. The generation mix relies on fossil fuels at 66%, with hydro contributing 27% and a small segment of nuclear and renewables. This pricing is competitive for the region but remains subject to local currency fluctuations.
Power Grid Reliability: Facilities in major IT zones utilize redundant substations and well-engineered distribution networks. Reliability is highest in purpose-built industrial parks where infrastructure is hardened against local grid instability.
Market Access, Business & Tax Climate
The business environment is geared for attracting foreign investment in the technology sector. Government policy focuses on making the digital economy a primary driver of national growth.
Proximity To Key Business Districts: Data centers are concentrated near Karachi, Lahore, and Islamabad. These locations provide immediate proximity to the financial services, manufacturing, and government sectors that drive local data demand.
Regional Market Reach: A presence in this market provides effective reach to over 240 million residents. It serves as a natural gateway for traffic moving between Western Asia and the broader Indo-Pacific region.
Tax Advantage For Data Centers: Investors benefit from 100% foreign equity ownership and significant income tax exemptions for software and IT services. Specialized financing support through export credit products for national data centers reduces the capital burden for large-scale projects.
Natural Disaster Risk
The overall risk profile is High (6.4/10), as of September 2025. Site selection must prioritize structural resilience and sophisticated water management systems due to the specific hazard environment.
- River Flood: 9.5/10. This is the most significant threat, requiring elevated equipment rooms and resilient drainage.
- Earthquake: 9.2/10. Seismic activity is a major consideration for structural engineering in most metro areas.
- Epidemic: 7.4/10. High density in urban centers necessitates resilient operational planning and remote management capabilities.
- Tropical Cyclone: 7.1/10. Coastal facilities face seasonal wind and rain hazards, requiring reinforced building envelopes.
- Tsunami: 6.1/10. While a risk for coastal Karachi, this is considered a regional hazard managed through site elevation and reinforced perimeters.
- Drought: 5.0/10. Water scarcity can impact cooling system choices, favoring air-cooled or closed-loop designs.