Data Centers in Luanda
5 locations found
- IW
IP WORLD Multipla
19 Estrada de Catete Tala-Hady AGO, Tala-Hady
- US
Unitel Luanda
Avenida Pedro de Castro Van-Dúnem Loy Tala-Hady AGO, Tala-Hady
- AC
Angola Cables Luanda
Avenida Pedro de Castro Van-Dúnem Loy Tala-Hady AGO, Tala-Hady
- US
Unitel FILDA
Rua das Flores Luanda AGO, Luanda
- IT
Paratus Angola Luanda
s/n Rua Lar Do Patriota Benfica Kifica AGO, Kifica
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Luanda – Strategic South Atlantic Connectivity Hub
Executive Summary
Luanda serves as the critical subsea landing point linking African markets to Europe and the Americas through high-capacity transit routes. It is an essential base for enterprises targeting the Angolan digital economy or requiring low-latency coastal distribution for oil, gas, and finance operations. Positioning infrastructure here provides a direct path into one of the fastest-growing economic sectors in the region.
Luanda: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Strategic hub for West African subsea landings as of September 2025. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major hub with direct on-ramps is Cape Town. |
| Power Cost | $0.04 – $0.06/kWh | Low rates driven by massive hydroelectric capacity as of September 2025. |
| Disaster Risk | High (5.5/10) | Flooding and drought are primary regional concerns as of September 2025. |
| Tax Incentives | No | Operates under standard national corporate tax frameworks as of September 2025. |
| Sales Tax | 14% VAT | Standard rate for hardware and services as of September 2025. |
Network & Connectivity Ecosystem
Luanda is the primary telecommunications gateway for Angola, serving as the bridge between regional terrestrial fiber and global subsea capacity.
Carrier Density & Carrier Neutrality: Carrier count: over 10. The market supports between 10–15 carriers as of September 2025. Private fiber operators provide the necessary diversity to support redundant enterprise routing alongside historical state entities.
Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions. There are no physical on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure in the city as of September 2025. Connectivity to these hyperscale environments is typically managed via private circuits to the nearest hub in Cape Town.
Internet Exchange Points (IXPs): Angonix serves as the primary local exchange, keeping domestic traffic local and minimizing reliance on expensive international subsea capacity as of September 2025.
Bare Metal: Resilient bare metal options are available through regional providers and global players like Latitude.sh, providing high-performance compute without the overhead of physical hardware ownership as of September 2025.
Power Analysis
Angola has invested heavily in hydroelectric projects, resulting in a power profile that is cost-effective and increasingly renewable.
Average Cost Of Power: Industrial electricity is priced between $0.04 – $0.06/kWh, as of September 2025. These competitive rates stem from the country's extensive hydroelectric projects, offering a major cost advantage for high-density, power-heavy deployments compared to other regional markets.
Power Grid Reliability: The electrical grid in Luanda's primary data center corridors is well-engineered and supported by multi-substation redundancy as of September 2025. Local operators maintain on-site backup generation to manage any localized distribution fluctuations effectively.
Market Access, Business & Tax Climate
Luanda is the economic heart of Angola, serving as the central hub for the nation's most lucrative industries.
Proximity To Key Business Districts: Facilities are strategically placed near Luanda Sul and Talatona as of September 2025. These districts house the headquarters for major financial institutions and global oil and gas firms that require low-latency access to their infrastructure.
Regional Market Reach: Luanda serves a domestic market of over 35 million people and acts as a transit path for landlocked neighbors seeking reliable Atlantic subsea connectivity as of September 2025.
Tax Advantage For Data Centers: No specific industry tax breaks exist for infrastructure providers as of September 2025. The low cost of power remains the primary financial driver for investment, as businesses operate under a standard 14% VAT.
Natural Disaster Risk
The natural disaster risk for Luanda is rated as High (5.5/10) as of September 2025. The environmental profile is defined by weather-related events rather than seismic activity.
- River Flood (3.9): Significant risk during heavy rainy seasons, requiring careful site selection and facility elevation as of September 2025.
- Drought (3.7): Regional droughts can impact the broader economy and potentially affect hydroelectric output consistency as of September 2025.
- Coastal Flood (3.4): As a coastal metro, Luanda faces moderate risks from storm surges, which operators manage through purpose-built facility hardening as of September 2025.
- Earthquake (0.1): Seismic risk is negligible, simplifying the structural requirements for new data center construction as of September 2025.
Other hazards such as tropical cyclones are not material risks for this market as of September 2025. Professional operators manage existing environmental risks through specific facility engineering and site placement.