Data Centers in Juba
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Juba – Critical Infrastructure for Frontier Market Stability
Executive Summary
Juba is the essential destination for organizations needing local data residency and direct service delivery within South Sudan. Establishing a presence here is vital for maintaining uptime in a high-stakes regional market where localized infrastructure translates to operational reliability. This location serves as the primary gateway for government, non-governmental organizations, and telecommunications providers prioritizing minimal latency over regional alternatives.
Juba: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Expanding fiber links provide resilient regional connectivity. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest major cloud on-ramp hub is located in Nairobi. |
| Power Cost | $0.38 – $0.48/kWh, as of September 2025 | Heavy reliance on fossil fuels drives higher operational costs. |
| Disaster Risk | High (8.5/10), as of September 2025 | Significant risk factors include flooding and regional instability. |
| Tax Incentives | No | No specific incentives exist for data center investments. |
| Sales Tax | 15.00% VAT, as of September 2025 | Standard value added tax applies to most digital services. |
Network & Connectivity Ecosystem
Juba functions as the primary digital gateway for South Sudan, with infrastructure improving to support international connectivity. As of September 2025, the ecosystem is centered on essential terrestrial fiber routes connecting to neighboring East African nations.
Carrier Density & Carrier Neutrality: Carrier count: 1–5 carriers, as of September 2025. While the market is developing, key domestic and regional providers maintain a presence to facilitate cross-border traffic and regional peering.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions, as of September 2025. There are currently no direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure within the city. Traffic is typically routed through Nairobi, Kenya, via private network interconnects or leased lines to reach global cloud gateways.
Internet Exchange Points (IXPs): The Juba Internet Exchange Point (JIXP) facilitates local traffic exchange, as of September 2025. This reduces the need for international hairpining, improving speed for domestic users and lowering transit costs for local providers.
Bare Metal: General availability is limited to specialized providers, as of September 2025. Organizations requiring high-performance compute often look to regional leaders or global providers such as OVHcloud or Leaseweb for edge deployments.
Power Analysis
Power remains a primary consideration for infrastructure in Juba due to the limited reach of the national grid and high dependency on liquid fuels.
Average Cost Of Power: Industrial electricity is estimated at $0.40/kWh, as of September 2025. The energy mix consists of approximately 95% fossil fuels and 5% renewables, primarily small-scale hydro and solar. These costs reflect the logistical challenges of fuel delivery and decentralized generation which impact the total cost of ownership for high-density deployments.
Power Grid Reliability: Data centers in Juba rely heavily on on-site generation and redundant power systems to manage frequent grid fluctuations. Modern facilities utilize sturdy industrial backup systems to maintain continuous uptime in the absence of a stable national utility.
Market Access, Business & Tax Climate
Strategic proximity to the administrative and commercial center of the country makes Juba the logical choice for digital infrastructure.
Proximity To Key Business Districts: Data centers are positioned near Juba City, providing immediate access to government ministries and the headquarters of international humanitarian organizations. This proximity is vital for secure, low-latency communication for mission-critical operations.
Regional Market Reach: Juba serves as the digital hub for a population of over 11 million people. It is the central point for data distribution across the ten states of South Sudan, connecting the capital to remote regions via satellite and microwave backhaul.
Tax Advantage For Data Centers: South Sudan provides a standard tax environment without specific exemptions for digital infrastructure. Maintaining local operations allows companies to manage tax liabilities within the national framework while supporting the growth of the domestic digital economy.
Natural Disaster Risk
Juba faces a High risk profile with an overall INFORM score of 8.5/10, as of September 2025. This assessment highlights the need for site selection and resilient engineering to mitigate environmental hazards.
- River Flood (7.8): Seasonal rainfall poses a significant threat to low-lying areas near the White Nile.
- Epidemic (7.4): Public health challenges can impact operational staff availability and logistics.
- Drought (3.7): Environmental factors may influence power generation and water-cooled cooling systems.
- Earthquake (2.7): Seismic activity is present but represents a lower direct threat to reinforced structures.
Other natural hazards, such as tropical cyclones and tsunamis, are not material risks for this inland location. Infrastructure providers manage these conditions through elevated site design and independent life-support systems for critical facilities.