Data Centers in Conakry
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Conakry – Gateway to West African Subsea Connectivity
Strategic Digital Infrastructure for Emerging Markets
Conakry is the primary digital gateway for organizations targeting Guinea and the broader Mano River Union economic zone. By leveraging direct subsea landing points, businesses secure the low-latency access and data sovereignty required to drive revenue and ensure operational resilience in a high-growth region.
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Reliable subsea access via the ACE cable system. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Nearest physical hubs are in Marseille or Lisbon. |
| Power Cost | GNF 1,150.00/kWh | Pricing benefits from a hydro-dominant regional grid. |
| Disaster Risk | Moderate (4.9/10) | Risks include seasonal rain and coastal weather. |
| Tax Incentives | No | General investment codes apply to infrastructure builds. |
| Sales Tax | 18.00% VAT | Standard national value-added tax rate applies. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: Carrier count: over 5. As of September 2025, the market supports a growing ecosystem of approximately 6–10 providers. The GUILAB landing station provides a carrier-neutral environment that facilitates wholesale bandwidth competition and reliable international transit.
Direct Cloud On-Ramps: Over 0, enabling access to 0 cloud regions. As of September 2025, major hyperscalers have not established physical local on-ramps. Secure access to AWS, Google Cloud (GCP), or Microsoft Azure is typically managed via dedicated network interconnects reaching European gateways, ensuring consistent performance for enterprise applications.
Internet Exchange Points (IXPs): The Guinea Internet Exchange Point (GIXP) serves as the primary local hub for traffic exchange. This facility keeps domestic data local, significantly reducing transit costs and improving response times for users within the country.
Bare Metal: Standardized hardware configurations are available through regional providers. Global options from Hivelocity or Latitude.sh provide remote orchestration for teams needing familiar management interfaces and rapid deployment of dedicated compute resources.
Power Analysis
Average Cost Of Power: Industrial electricity is approximately GNF 1,150.00/kWh, as of September 2025. This cost structure is supported by a generation mix that favors hydropower, which helps stabilize long-term operational expenses compared to markets reliant solely on imported fossil fuels.
Power Grid Reliability: The grid in primary commercial districts is well-engineered and supports multi-substation connections to maintain uptime. Local operators supplement the grid with on-site generation and battery systems to manage occasional fluctuations, ensuring continuous operation for critical hardware.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are centrally located near the Kaloum and Ratoma districts. This proximity provides the banking, mining, and government sectors with high-speed access needed to manage hosted applications without latency penalties.
Regional Market Reach: Conakry acts as the digital springboard for Guinea and provides vital backhaul routes into landlocked neighboring markets. This makes it a sturdy base for firms looking to establish a presence across the West African economic zone.
Tax Advantage For Data Centers: While no specific tax breaks exist for the data center sector, the general investment code offers benefits for large-scale infrastructure projects. These benefits primarily focus on reducing the cost of importing specialized technical equipment for initial facility builds.
Natural Disaster Risk
The risk profile for Conakry is Moderate (4.9/10) as of September 2025. The most significant factors are related to the coastal climate and high seasonal rainfall common in West Africa.
- River Flood: 5.5. High seasonal rainfall can lead to localized flooding in specific low-lying sectors, requiring careful site selection.
- Coastal Flood: 4.9. Proximity to the Atlantic makes coastal surge a factor for building elevation and perimeter protection.
- Tsunami: 2.7. This is considered a low-probability regional risk but is noted due to the city's coastal positioning.
- Drought: 0.7. Minimal impact on operations or cooling systems as of September 2025.
Other hazards such as tropical cyclones and earthquakes are not listed as material risks for this geography as of September 2025.