Inflect logo
All Data CentersAfricaDemocratic Republic of the Congo

Data Centers in Democratic Republic of the Congo

4 locations found

Data centers map in Democratic Republic of the CongoInteractive map loads on demand to keep the page fast.

Need Help?

Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.

Explore Markets in Democratic Republic of the Congo

Democratic Republic of the Congo – Gateway to Central Africa

Executive Summary

This market is for operators requiring direct access to a population exceeding 100 million people. Positioning infrastructure here offers the first-mover advantage necessary for banking and telecommunications to lead in Central Africa. Establishing a presence in this territory secures the proximity required to serve one of the final frontiers of digital growth.

Democratic Republic of the Congo: At A Glance

FactorRating / DataNotes
Global Connectivity GradeBSubsea cable access is steadily improving regional latency.
Direct Cloud On-Ramps0 – as of September 2025Nearest hub is Johannesburg; connectivity requires private extension lines.
Power Cost$0.07 – $0.12/kWh, as of September 2025Hydroelectric mix provides a renewable profile for sustainability goals.
Disaster RiskHigh (8.1/10), as of September 2025Environment and systemic factors require resilient facility engineering.
Tax IncentivesNoNo specific government credits exist for digital infrastructure.
Sales Tax16.00% VAT, as of September 2025Standard national value-added tax applied to all services.

Network & Connectivity Ecosystem

Carrier Density & Carrier Neutrality: Carrier count: over 5. As of September 2025, the market features between 5–10 carriers providing local and regional transit. Facilities focus on neutrality to support the demand for diverse fiber paths across the capital city.

Direct Cloud On-Ramps: 0, enabling access to 0 cloud regions as of September 2025. No direct on-ramps for AWS, Google Cloud (GCP), or Microsoft Azure currently exist within the country. Access to these services is managed through private extensions or leased lines to the nearest major hub in Johannesburg.

Internet Exchange Points (IXPs): The Kinshasa Internet Exchange (KINIX) serves as the primary local peering point, keeping local traffic within the country to lower latency and costs.

Bare Metal: Resilient bare metal services are available through regional providers and global players like OVHcloud, offering remote deployment options for the Central African market.

Power Analysis

Average Cost Of Power: $0.07 – $0.12/kWh, as of September 2025. The energy mix is dominated by hydroelectric power, which accounts for approximately 99% of production. This renewable focus provides a specific profile for companies with sustainability requirements, though price stability depends on continued infrastructure investment.

Power Grid Reliability: The grid in major data center corridors like Kinshasa is purpose-built to support industrial loads. Facilities typically utilize redundant substation support and reliable onsite backup to manage the variability of the national distribution network.

Market Access, Business & Tax Climate

Proximity To Key Business Districts: Data centers are primarily located in Kinshasa, specifically near the Gombe and Cliniques districts. This positioning is vital for serving the government, diplomatic missions, and the headquarters of major banking and telecom firms.

Regional Market Reach: A presence here provides access to a population exceeding 100 million people. It serves as a central gateway for traffic moving across Central Africa and into neighboring landlocked territories.

Tax Advantage For Data Centers: The market currently offers no specialized tax breaks for digital infrastructure. Operating costs remain standard without specialized government credits for the sector as of September 2025.

Natural Disaster Risk

The Democratic Republic of the Congo faces a high level of risk with an overall score of High (8.1/10) as of September 2025. Infrastructure planning must account for significant environmental and systemic factors to ensure uptime.

  • Epidemic: 8.3 (High) – A major factor in regional operational and staffing planning.
  • River Flood: 7.0 (High) – Significant risk in the Congo River basin that requires specific site selection.
  • Earthquake: 4.2 (Moderate) – Geological activity is a factor in specific regions.
  • Drought: 2.3 (Low) – Occasional impacts on hydroelectric output.

Other hazards such as Tropical Cyclone and Coastal Flood are minor or not listed for the primary metropolitan data center clusters.

WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Inflect logo
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners
EquinixZayoDigital RealtyAT&T BusinessLumenArelion