Free advice from industry experts
No fees, no mark-up, no sales pitch
Instant pricing. Only at Inflect
Verizon CMETMA is a data center located at 300 Bent Street in Cambridge, MA, serving the Boston data center market. This Verizon CMETMA data center building offers a range of colocation options and resilient network connectivity services. It provides a strategic location for businesses seeking reliable infrastructure in the greater Boston area.
Verizon supports colocation through cabinets and cages, providing flexible deployment formats for diverse IT requirements. Connectivity options include Dedicated Internet Access (DIA), IP Transit, Ethernet Private Line, and wavelength services. Buyers can compare these services and available specifications, request quotes, and coordinate procurement through Inflect.
The Boston market's industrial electricity rates for October 2025 are between 9.891–10.247 ¢/kWh. The regional power mix is approximately 70% fossil fuels, with renewables, primarily solar, making up about 29%. Verizon operates Verizon CMETMA as part of its extensive global footprint.
Q: What network and connectivity options are listed for Verizon CMETMA?
A: Verizon CMETMA offers a variety of network and connectivity options, including Dedicated Internet Access (DIA), IP Transit, Ethernet Private Line, and wavelength services. These offerings provide direct internet access and private connectivity solutions for the facility.
Q: What power or sustainability context is available for Verizon CMETMA?
A: For Verizon CMETMA, the market power context indicates industrial electricity rates in Boston are projected between 9.891–10.247 ¢/kWh for October 2025. The regional electricity mix is roughly 70% fossil fuels and 29% renewables, with solar contributing significantly to the renewable portion.
Q: How many data centers does Verizon own?
A: Verizon CMETMA is part of Verizon's portfolio of 203 owned data centers.