Free advice from industry experts
No fees, no mark-up, no sales pitch
Instant pricing. Only at Inflect
Zayo’s 2024Partner of the year
Nearest Airport
Nearby Data Centers
The data center at 2200 Busse Road in Elk Grove Village offers a robust environment for server hosting and data storage. It features a power infrastructure with diverse utility feeds and on-site generators, ensuring high availability and redundancy. The cooling system is designed with N+1 redundancy, maintaining optimal temperature and humidity levels for efficient equipment operation. Security is a priority, with measures such as 24/7 on-site personnel, biometric scanners, and CCTV surveillance. The facility also provides extensive connectivity options, including access to multiple Tier 1 carriers and direct connections to major internet exchanges, ensuring low latency and high bandwidth for data transfer.
Talk to an Expert
Available Services
Discover services that fit your data center needs and easily compare them for free. Start your configuration now.EcosystemDiscover digital partners and connection opportunities
An ecosystem is a community of companies and service providers working together within a data center. It makes it easy for businesses to connect, share data, and access services like cloud computing and colocation.Connectivity options in Deft DF-CH1
13
Service Providers4
Cloud Providers0
Peers16
Companies
ZayoSilver Partner | |
LumenSilver Partner | |
Crown Castle FiberBronze Partner | |
Specification
compliance
NIST SP 800-171 (DoD)
FACT
HIPAA
ISO 14001
ISO 22301
ISO 27001
ISO 50001
ISO 9001
NIST SP 800-53
OHSAS 18001
PCI DSS
SOC2
SOC3
SOC 1 (SSAE 16)
Tier Rating Compliant Tier III
Uptime Institute ratingTier III
datacenter
Floor load max450 lb / sq ft
Building ownership statusLeased
Total space485000 sq ft
power and cooling
Cooling configurationAir-cooled chillers and air handlers
Cooling redundancyN+1
CRAC units
Double knock activation
Diverse fiber entryy
Floor typeRaised
FM200
Generator configuration32x 2.25 MW diesel generators
Generator redundancyN+2
Water mist system
Hot / cold aisleYes
Maximum power per rack20 kW
Minimum power per rack1 kW
Pre-action dry pipe system
Total power36500 kW
UPS configurationThirty Three 1,300kW rotary UPS systems
UPS redundancyN+2
VESDA
products and services
Bare metal server
Colocation
Colocation by 1/2 cabinets
Colocation by 1/4 cabinets
Colocation by the Unit
Cross connect install time24 hours
Locking cabinets
Private cage
Private cloud
Private suite
Remote hands
Public cloud
security
Biometrics
CCTV
Keycards
Mantraps
Physical security
Physical security hours24/7/365
PIN access
Didn't find what you were looking for?
If you didn't find what you were looking for, please contact us and we will be happy to help you.
WHY CHOOSE US?Helping You Find Connectivity Solutions For Your Business
Expert SupportGet help from industry pros. Free of charge
Best DealsAccess exclusive deals from top providers.
Seamless ExperienceResearch, compare and purchase, all in one place.
Fast ResponsesGet your questions answered within 24 hours.
Our Partners










