Free advice from industry experts
No fees, no mark-up, no sales pitch
Instant pricing. Only at Inflect
Beyond.pl POZ02 is a data center located at 11 Adama Krƒôglewskiego in Poznan, Poland. This facility is designed for performance-sensitive deployments, offering 42,000 kW of power capacity and operating on 100% renewable energy with a PUE of 1.2, indicating efficient facility energy use. It provides a connectivity ecosystem with 31 listed networks and direct access to internet exchanges like EPIX Poznan and THINX Warsaw.
Buyers can procure colocation at Beyond.pl POZ02, available through cabinets and cages. The facility also supports a range of connectivity options, including dedicated internet access (DIA), IP transit, Ethernet Private Line, and wavelength services. Key networks such as Cogent Communications and Arelion Twelve99 are present, offering diverse interconnection choices. Inflect lists these service categories on its marketplace, where businesses can compare costs, view instant pricing, and coordinate contracting through the procurement workflow.
The Beyond.pl POZ02 data center features 2(N+1) redundancy for both UPS and cooling systems, supporting stable operations for critical infrastructure. Physical security includes 24/7 monitoring, and the facility maintains compliance with certifications such as PCI DSS, ISO 27001, and EN 50600. Beyond.pl operates this site as part of its portfolio, providing a secure and efficient environment for digital infrastructure.
Q: What network and connectivity options are listed for Beyond.pl POZ02?
A: Beyond.pl POZ02 offers extensive network and connectivity options, with 31 listed networks including Cogent Communications and Arelion Twelve99. Buyers can access direct, low-latency interconnectivity through internet exchanges such as EPIX Poznan and THINX Warsaw.
Q: What power or sustainability context is available for Beyond.pl POZ02?
A: Beyond.pl POZ02 operates with a planned power capacity of 42,000 kW and utilizes 100% renewable energy. The facility achieves a Power Usage Effectiveness (PUE) of 1.2, indicating efficient facility energy use.
Q: What disaster-risk context is available for Beyond.pl POZ02?
A: For Beyond.pl POZ02, country-level natural-hazard context for Poland is low.