Data Centers in Laos
1 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Laos – An Emerging Frontier for Digital Infrastructure
Laos is an early-stage market suited for organizations targeting the local population or establishing a foundational presence in the Greater Mekong Subregion. While the digital ecosystem is still developing, Laos offers exceptionally low power costs, providing a strategic advantage for scalable deployments as regional connectivity improves. This market is for pioneers building for the future of Southeast Asia's digital economy.
Laos: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | Connectivity is developing, relying on regional hubs. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Access is via Bangkok or Singapore through private network extensions. |
| Power Cost | US$0.04/kWh | Extremely competitive industrial power rates. |
| Disaster Risk | Moderate (3.6/10) – as of September 2025 | River floods are the primary environmental risk to consider. |
| Tax Incentives | No | No specific data center incentives are currently offered. |
| Sales Tax | 7-10% VAT – as of September 2025 | A standard national Value Added Tax applies to services. |
Network & Connectivity Ecosystem
Carrier Density & Carrier Neutrality: As an emerging market, Laos has a developing carrier ecosystem, with over 5 providers available as of September 2025. Carrier-neutral facilities are not yet established, with connectivity primarily offered through the incumbent national telecom operator.
Direct Cloud On-Ramps: There are no direct cloud on-ramps located within Laos, as of September 2025. Access to hyperscale cloud providers requires network connections to major regional hubs like Bangkok, Thailand, or Singapore. Private network extensions can provide secure, dedicated access.
Internet Exchange Points (IXPs): Public internet exchanges are not a feature of the current digital landscape. Peering is typically handled privately between service providers or transit partners, often routing through neighboring countries.
Bare Metal: Bare metal server options are available, primarily through providers that can deploy equipment into the region. Services from providers like Leaseweb can offer dedicated server solutions for businesses needing compute resources inside the country.
Power Analysis
Average Cost Of Power: The average cost for industrial power in Laos is approximately US$0.04/kWh, as of September 2025. This rate is among the lowest in Southeast Asia and presents a significant operational cost advantage for power-intensive workloads.
Power Grid Reliability: The national power grid is developing, with reliability being highest in the capital, Vientiane. Data center operations require robust on-site redundant power systems, including UPS and diesel generators, to ensure consistent uptime.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data center infrastructure in Laos is concentrated in and around the capital, Vientiane. This provides direct access to the country's primary economic hub, government agencies, and financial institutions.
Regional Market Reach: While primarily serving the domestic population, Laos offers a strategic geographic position to connect Vietnam, Thailand, Cambodia, and China. It can serve as a foundational piece of a broader Greater Mekong Subregion digital strategy.
Tax Advantage For Data Centers: There are no specific tax incentives for data centers. The government does not currently offer programs targeting investment in digital infrastructure.
Natural Disaster Risk
Laos has a moderate overall disaster risk profile, with a score of 3.6 out of 10, as of September 2025. The primary environmental threats are climate-related, rather than seismic.
Key risks include:
- River Flood: The highest individual risk (8.2/10), particularly during the monsoon season along the Mekong River basin.
- Earthquake: A moderate risk (2.8/10), with the country located near active fault lines in the region.
- Tropical Cyclone: A lower but present risk (1.4/10), as storm systems can move inland from the coast.
- Drought: A notable risk (1.4/10) that can impact agriculture and hydropower generation.