Data Centers in Willemstad
2 locations found
Need Help?
Tell us about your needs and our team of experts will help you find and choose the perfect Data Center and solution at the best price.
Willemstad – Strategic Caribbean Connectivity Hub
Willemstad offers a stable and strategic colocation market for businesses targeting the Caribbean, Central America, and South America. Its location outside the primary hurricane belt provides a significant uptime advantage, delivering reliable, low-latency access to developing digital economies.
Willemstad: At A Glance
| Factor | Rating / Data | Notes |
|---|---|---|
| Global Connectivity Grade | B | A strong grade for a regional island market. |
| Direct Cloud On-Ramps | 0 – as of September 2025 | Access is via private network extension to hubs like Miami. |
| Power Cost | $0.28 - $0.36/kWh – as of September 2025 | Reflects reliance on imported fuel for power generation. |
| Disaster Risk | Low – as of September 2025 | The island is situated outside the main Atlantic hurricane corridor. |
| Tax Incentives | No | No specific data center incentive programs are currently offered. |
| Sales Tax | 6.0% - 9.0% OB – as of September 2025 | OB (Omszetbelasting) is the local turnover tax. |
Network & Connectivity Ecosystem
Willemstad is a key communications hub for the Southern Caribbean, supported by multiple subsea cables landing on the island.
Carrier Density & Carrier Neutrality: With at least 2 data centers, the market provides access to a focused group of ~5-10 regional and international carriers as of September 2025. Carrier-neutral facilities are available, offering choice in connectivity.
Direct Cloud On-Ramps: There are no direct public cloud on-ramps in Willemstad as of September 2025, with 0 cloud regions accessible locally. Businesses connect to major cloud providers like AWS, Google Cloud, and Microsoft Azure through private network connections to the nearest primary hub in Miami.
Internet Exchange Points (IXPs): The market is served by AMS-IX Caribbean, which facilitates efficient local traffic exchange and reduces latency for users across the island and region.
Bare Metal: Bare metal server options are available from global providers. Companies like Hivelocity can service deployments in the region, providing dedicated compute for performance-sensitive workloads.
Power Analysis
Average Cost Of Power: Industrial power rates typically range from $0.28 to $0.36/kWh as of September 2025. These costs are influenced by the island's reliance on fossil fuels for its grid, making data center power efficiency a key operational factor.
Power Grid Reliability: The local power grid is stable for a primary commercial center. Data centers in Willemstad are built with significant power redundancy, including UPS systems and on-site generators, to ensure uptime for critical IT infrastructure.
Market Access, Business & Tax Climate
Proximity To Key Business Districts: Data centers are located to serve Willemstad's core business districts, which are centers for international finance, logistics, and online gaming industries.
Regional Market Reach: The island's strategic location makes it an excellent digital gateway to the Southern Caribbean and the northern coast of South America, including Venezuela and Colombia.
Tax Advantage For Data Centers: While Curaçao does not offer tax incentives specifically for data centers, the country has E-Zone and other free trade zone policies. These programs can provide significant tax advantages for international companies using the island as a base for their operations.
Natural Disaster Risk
Willemstad has a low natural disaster risk profile as of September 2025. The island's most significant advantage is its location south of the Atlantic's principal hurricane alley, which dramatically reduces the threat of major storm activity.
Key environmental risks are minimal and include:
- Hurricane: Low risk
- Coastal Flood: Low risk
- Tsunami: Low risk
- Drought: Low risk